When the Job Is a Floor Coating, Not Paint

3 min read

A commercial floor coating — epoxy, urethane, or a similar resin system on concrete — is a different scope from painting the walls. The work is shot blast or grind, repairs to the slab, a system with its own recoat windows, and a shutdown while it cures. A wall-paint bid that adds “and the floor” has not priced a floor. The building around that mistake is described in warehouse and industrial painting cost. The screen for the paint portion is commercial painting cost per square foot.

How to tell which job you have

You have a paint job when the surfaces are walls, ceilings, doors, frames, and the exposed structure. You have a floor job when someone needs the slab to resist forklifts, chemicals, washdown, or a slip requirement, or when the finish is a broadcast, a flake, or a high-build resin rather than a can of floor enamel.

Floor enamel rolled over a dirty slab is a paint product used in the wrong place. It fails under wheels. If that is what a bidder included, ask them to say so. A resin system will say how the concrete is opened up, which primer, which body coat, which topcoat, and how long before foot traffic and wheel traffic.

Prep is most of the price

Concrete decides the system. Coatings fail on laitance, grease, moisture vapor, and joints that were ignored. A serious bid names the prep method, the tests they will run for moisture, and what happens if the slab fails the test. An allowance for moisture mitigation is honest. A promise that every slab can be coated next week is not.

Joints, cracks, and spalls are either in the base price, with a quantity, or they are a unit price. “Patch as needed” on an old warehouse slab is an open number. Walk it and agree the quantity, the same way you would agree peel on a wall before award. What a commercial painting estimate should itemize is the shape of that sheet, even when the trade is the floor.

Shutdown, and who should bid it

Resin floors need a temperature range and a stay-off. A grocery back room that must receive deliveries at dawn cannot take the cure window of a system specified for an empty bay. Put the hours in the scope. Phasing aisle by aisle is a series of mobilizations, not a discount.

Many painting contractors do not install these systems. Some do, or they partner with a crew that does. Ask which, and ask who is on site for the blast and the pour. Awarding the walls and the floor to one contract is convenient only when that contractor actually priced both. Otherwise take two scopes and two awards, and write the line where they meet so the painter is not blamed for overspray on a new floor, or the floor crew for dust on wet walls.

Describe the building and choose Commercial when you want a painting contractor to price the walls and to tell you plainly whether the floor is theirs.