A Scope Letter a General Contractor Can Compare
A GC compares painting bids on the scope letter. Surfaces, prep, exclusions, and who provides the lift have to be written or your number is not in the set.
Eric BumanNovember 16, 2026A GC compares painting bids on the scope letter. Surfaces, prep, exclusions, and who provides the lift have to be written or your number is not in the set.
Eric BumanNovember 16, 2026A commercial painting change order is extra scope priced in writing before the work. Verbal additions are how both sides lose the number.
Eric BumanNovember 16, 2026Dryfall is a coating for exposed structure, chosen because overspray is meant to drop as dust. It is still a system, with masking, height, and a stay-off period.
Eric BumanNovember 16, 2026An elastomeric coating bridges hairline cracks in stucco and masonry. It does not stop a leak, and it is not a thicker coat of ordinary paint.
Eric BumanNovember 16, 2026A property-management vendor list is an insurance file and a scoped proposal, not a bid board. Get on it before the building is due.
Eric BumanNovember 16, 2026Hospital and clinic painting is an infection-control plan plus a coating spec. The corridor stays a corridor while the work is underway.
Eric BumanNovember 16, 2026Hotel painting is brand colors, guest hours, and a split between rooms you can close and lobbies you cannot.
Eric BumanNovember 16, 2026Most commercial exteriors are planned on a 5- to 10-year cycle. The film decides, not the anniversary, and the number is a screen rather than a bid.
Eric BumanNovember 16, 2026Public painting work adds a wage determination, bonds, and certified payroll to the takeoff. Price the packet, or do not bid it.
Eric BumanNovember 16, 2026After-hours commercial painting is a schedule, a notice, and a phase plan. The price follows the hours the building can actually give up.
Eric BumanNovember 16, 2026On a commercial repaint the gallons are the cheap line. Prep, patching, and caulk are the scope that decides whether the film lasts.
Eric BumanNovember 16, 2026School painting is a calendar first. Summer, breaks, and nights decide the price, and older buildings need a test before anyone sands.
Eric BumanNovember 16, 2026A commercial epoxy or urethane floor is surface prep and a coating system, with its own shutdown. It is not a line on a wall-paint bid.
Eric BumanNovember 16, 2026Commercial painting is usually planned at about $1.50 to $6.00 per square foot of paintable surface. Here is what that number measures, and what a real bid has to add.
Eric BumanNovember 15, 2026Commercial painting and residential painting sell to different buyers, on different schedules, with different cash and different supervision. The brush is the similar part.
Eric BumanNovember 15, 2026An HOA exterior painting bid prices the common-area elevations your documents actually assign to the association, on one scope every bidder can walk.
Eric BumanNovember 15, 2026A commercial painting warranty is the term, the failures it covers, and the remedy in the contract. Workmanship and the manufacturer's material warranty are two different promises.
Eric BumanNovember 15, 2026Low-VOC paint for an occupied office is a content number, an emissions test, and a schedule that lets the film cure before people sit in the room.
Eric BumanNovember 15, 2026Primer, coat count, and sheen are the three lines that decide whether a commercial repaint covers, hides, and can be washed. They belong in the spec before anyone prices the job.
Eric BumanNovember 15, 2026Two commercial painting bids are comparable when both answers name the same surfaces, prep, products, coats, access, hours, and exclusions. Ask these before you read the price.
Eric BumanNovember 15, 2026A retail or restaurant repaint is priced around trading hours, brand colors, and the split between the dining room and the surfaces grease and washdown actually touch.
Eric BumanNovember 15, 2026Price commercial painting from a takeoff by system and production rates from your own completed jobs. A national square-foot table is a check, not your payroll.
Eric BumanNovember 15, 2026Commercial painting work comes from property and facility managers, general contractors, public solicitations, and relationships you already have. Each path asks for a different packet.
Eric BumanNovember 15, 2026Hire a commercial painter against a written scope, proof they can work on an occupied building, and bids you can compare line for line.
Eric BumanNovember 14, 2026A commercial painting estimate you can compare names the surfaces, the prep, the products, the coats, the access, the schedule, and the exclusions.
Eric BumanNovember 13, 2026A commercial painting contract records the surfaces, the price and payment schedule, the products and coats, the real schedule, the change-order path, and the warranty.
Eric BumanNovember 12, 2026Before you award a commercial painting bid, check insurance, license where your state requires one, similar finished work, and that the scopes match.
Eric BumanNovember 11, 2026Bid commercial painting from a takeoff by paint system, your own production rates, and a scope letter a buyer or a GC can compare line for line.
Eric BumanNovember 10, 2026A commercial paint spec names the surface, the prep, the product, the sheen, and the coat count. Here is how to read one before you price or award it.
Eric BumanNovember 9, 2026Office painting is either a refresh of an occupied suite or a tenant improvement with other trades still in the rooms. The scope, the hours, and the price change with which one it is.
Eric BumanNovember 8, 2026Multifamily painting splits into unit turns, common areas, and exterior cycles. Each has its own clock, its own scope, and a reason to keep one vendor.
Eric BumanNovember 7, 2026Interior commercial painting cost depends on which surfaces are in the scope, how many openings you cut in, and whether the building stays occupied.
Eric BumanNovember 6, 2026Warehouse painting is priced from height, substrate, and whether the building can stop. Floor area is a poor stand-in for the paintable surface.
Eric BumanNovember 5, 2026Exterior commercial painting runs about $2 to $6 per square foot of surface in national guides, and higher when the building is tall, the substrate has failed, or the coating is elastomeric.
Eric BumanNovember 4, 2026