What Belongs in a Commercial Painting Contract

3 min read

A commercial painting contract is the estimate, made enforceable. The price, the surfaces, the products, the calendar, and the way the scope grows all have to be in the document you sign. A proposal that never becomes those terms is a conversation you will relitigate at punch.

Six parts do that work.

Scope, surface by surface

Attach the itemized estimate, or copy it in. Walls, ceilings, trim, doors, frames, and exterior materials are each named, along with what is excluded. “Paint the office” is not a scope. “Lobby walls and ceiling, two finish coats, frames excluded” is. The standard for what the estimate contains is what a commercial painting estimate should itemize.

Drawings and a finish schedule, if you have them, are listed as contract documents, with a note about which one governs when they disagree. The paint specification usually says. If it does not, decide before you sign.

Price and payment

State whether the price is a lump sum or a unit-price schedule, and what deposit, progress payments, and final payment look like. Larger commercial jobs often hold a retainage until punch is complete. Say the percentage and what releases it.

Name the allowances. An allowance for drywall repair or peel-and-stick failures needs a unit price for the quantity beyond the allowance, or the next patch is a dispute.

The cover rate only helps as a check against commercial painting cost per square foot. The contract price is the itemized number.

Products, coats, and a sample

Specify the product line, the sheen, and the coat count per surface, including primer. If a mockup or a benchmark sample is required, say where it lives and who accepts it. On an occupied floor, that sample is how you avoid repainting a wing because the sheen read differently under the building’s lights.

Schedule and hours

A start date, a duration, and the hours work is allowed. Occupied offices, clinics, hotels, and schools need the phasing in the contract: which floor, which nights, how much notice tenants get, and how many times the crew mobilizes. Painting an occupied building is that window. Clinics, hotels, and schools add their own constraints in healthcare and occupied medical interiors, hotels and hospitality common areas, and school and campus painting. “About three weeks” slips. “Nights, floors 3 then 4, substantial completion on a date” can be managed.

Weather belongs on exterior work. State how rain days are counted so a wet week does not become an argument about delay.

Changes in writing

Someone will add a stairwell, a set of frames, or a color in the boardroom. The contract says that extra work is a written change order, priced before the work, at the unit prices in the bid or at a stated labor and material rate. Verbal additions are how both sides lose track of the job. Change orders on a commercial paint job is how to tell an addition from prep the bid already included.

Warranty, insurance, and cleanup

A workmanship warranty has a term and a definition. How commercial painting warranties actually work separates that promise from a manufacturer’s material warranty. It covers peeling, blistering, and failure of the film the contractor applied on the surface they were given. It does not cover a roof leak, a tenant who scrapes a corner with a hand truck, or substrate movement the coating was never specified to bridge. Say so.

Insurance requirements — general liability, workers’ compensation when the contractor has employees, and additional insured status when the owner or the manager requires it — are exhibits, not a sentence that says “fully insured.” Confirm them before award, using what to verify before you award a commercial painting bid.

Cleanup, debris, and protection of adjacent finishes close the scope. The crew leaves the floor the way an occupied building needs to open in the morning.

How to hire a commercial painting contractor is the path up to this document. When the building is ready, start with the project details and choose Commercial.