Skip to content

How to Read a Commercial Paint Specification

4 min read

A commercial paint specification tells the painter what “done” means on each surface. Owners and facility managers use it so every bid prices the same work. Estimators use it so the crew does not discover the coating system on the first morning. If you are either of those people, read the spec before you read the price.

Where it lives

On a formal project the painting section sits in the project manual, usually beside a finish schedule on the drawings. The schedule names the room, the substrate, the sheen, and a code. The spec section defines the code: surface preparation, primer, finish coats, and the product or a performance standard such as an MPI number.

On a repaint for a property manager there may be no project manual. The proposal has to become the spec. Product, sheen, coats, and prep, written down, are the specification. What a commercial painting estimate should itemize is that shorter form.

Products, sheens, and “or equal”

A line that names a manufacturer and a product is a closed choice unless the spec allows a substitution. A line that cites an MPI category, or says “or approved equal,” is an open choice with a bar the equal has to clear. Substitutions are approved before the bid, or priced as a voluntary alternate. Putting an unapproved product in the base bid is how a painter wins a job they cannot buy out.

Sheen is a performance choice as much as a look. Primer, coat count, and sheen is the practical version when you are writing the scope yourself. Eggshell and satin show less abuse on corridors and doors than flat, and they show more defects in the drywall. Flat hides a ceiling. The spec is deciding maintenance, not only color. Extra colors and accent walls are labor. Count them.

Prep and coat count

Read the prep paragraph against the building you walked. “Prepare as required for a smooth finish” is not a quantity. Scrape, wash, patch, caulk, spot prime, and full prime are quantities. If the spec assumes a sound existing film and the elevation is peeling, the spec and the building disagree. Qualify the peel as an allowance or a unit price. Do not hope it is incidental.

Coat count includes primer. “Two coats” on bare drywall and “two coats” on a previously painted, same-color wall are different material and labor. The spec should say which substrates are primed.

Mockups, submittals, and inspection

Many specs require a product submittal and a sample area before full production. The sample is the standard for sheen, color, and how much substrate texture remains. Agree where it is viewed, and under the lights the occupants will use.

Industry standards from the Painting Contractors Association, and older PDCA standards still cited in project manuals, cover benchmark samples, inspection, and which trade pays to touch up damage caused by others. Use the edition the spec names. A standard number remembered from the last job may be a different clause in this manual.

Inspection distance matters. A wall judged from a few feet under rental lights is a different standard from a wall judged with a lamp against the surface. Price and supervise to the standard that is written.

When the documents disagree

The spec usually says whether the specifications, the drawings, or the stricter reading governs. Follow that clause. Where it is silent, ask in a pre-bid question and price the stricter reading as an alternate so the number in your base bid stays comparable.

Hazardous coatings are the same kind of gap. If the building is old enough that existing paint might contain lead, or the spec tells you to sand and strip without a report, exclude disturbance of those coatings until there is a test. Put the exclusion in the bid.

What you do with it

Owners: attach the spec to every bid invitation, and award only bids that acknowledge it. The contract terms around that award are in what belongs in a commercial painting contract.

Painters: take off by the system the spec defines, and list every exclusion in the scope letter. How to bid a commercial painting job is that sequence.

Find a painter when the spec is ready for a contractor. For painters when you are the shop pricing specs like this under your own name.

Related Articles

Comments