How to Bid a Commercial Painting Job
A commercial painting bid is a takeoff by paint system, priced with your crew’s production rates, then wrapped in a scope letter someone else can compare. The shops that win work they can finish all do those three steps. The shops that win on a square-foot guess spend the job discovering the frames, the lift, and the third mobilization.
This is the contractor’s side of the same sheet owners are told to demand in what a commercial painting estimate should itemize.
Read the spec before you measure
On a bid set, the finish schedule, the specification section, and the drawings disagree often enough to price twice if you do not notice. Products and sheens per surface, mockups, attic stock, and who approves a substitution all change the number. How to read a commercial paint specification is the pass to make before the takeoff.
If the spec is silent because the job is a repaint for a property manager, write the spec yourself in the proposal: product, sheen, coats, and prep. Then you are bidding a defined system, and so is the next painter they ask.
Take off by system
Measure each system separately.
- Gypsum walls, primer and two finish coats, rolled.
- Ceilings, sprayed or rolled.
- Hollow-metal doors and frames, per opening, both sides.
- Exposed deck and structure, dryfall, with the area multiplier your sprayers actually get, plus masking.
- Exterior cladding by substrate, because stucco, wood, and metal do not share a rate.
- Caulk and patch as their own quantities when they are more than incidental.
Floor area of the suite is a check on your wall takeoff. It is a poor quantity to price from. Count colors. A second and third color is cutting, not just gallons.
Price with your rates
Convert quantities to hours with production from your own completed jobs. Takeoff and production rates by paint system is how to keep that rate honest. A published rate from a national manual is a place to ask “are we close?” It is not your payroll. Add the hours that never appear in a square-foot table: setup, protection, cleanup, punch, and the speed you actually get on occupied nights.
Then add:
- Material, including waste and the colorant the spec implies
- Labor burden on top of the wage
- Lifts, stages, and delivery, for the weeks you will have them
- Extra mobilizations, one by one
- Supervision, submittals, and a mockup if the spec calls for them
- Overhead and profit as a deliberate margin, not whatever is left
If the general contractor provides the lift, exclude it in writing and price the alternate where you provide it. Silent assumptions are how you buy the lift yourself.
Write the scope letter
The buyer and the GC are comparing you to another painter on paper. A scope letter a general contractor can compare is the longer version of this list. The letter that gets read states:
- Surfaces included and excluded
- Prep level and coat count
- Product and sheen you priced, and whether an approved equal is still open
- Access you included
- Hours and number of mobilizations
- Unit prices for added doors, added colors, and unforeseen peel or patch
- Lead, asbestos, and other hazardous coatings excluded until tested
- How long the price holds
A low bid with those lines filled in beats a lower bid that is a single paragraph. Owners are coached to throw out the paragraph. Meet the sheet they were told to require.
Where the work comes from
Repaint work often starts with the owner or the property manager, before it is a public bid. New construction and tenant improvements often start with a general contractor’s invite. Public work adds bonds, prevailing wage, and a bid form. Insurance, bonding, and prevailing wage on public work is why those lines cannot share your private repaint rate. Price the packet you were sent. The selling price you show a facility manager is the same math with a shorter cover.
Paintaire is the system for running that path under your own brand, from the lead through the estimate, the proposal, the schedule, and payment. See it from the painter’s side.
The owner’s view of the number you just built is commercial painting cost per square foot. Read it when you want to see which line they will challenge first.