Insurance, Bonding, and Prevailing Wage on Public Work
A prevailing-wage painting contract is a commercial bid plus the labor rate, the fringes, and the paperwork the solicitation requires. Bonding and insurance are separate lines in the same packet. A house rate that ignores the wage determination is how a shop wins a job it cannot legally pay. The takeoff underneath is still how to bid a commercial painting job. Where these solicitations show up is in where commercial painting work comes from.
Read the wage determination before you price labor
Federal projects that require prevailing wages publish a wage determination. States, cities, school districts, and housing authorities publish their own when their rules apply. The determination names a rate and fringe for the classification you will actually put on the wall. Your burdened shop rate does not replace it. If the required rate is higher, the hours in your takeoff cost more. If you do not know the classification — painter, taper, a trainee ratio — ask in a question during the bid window, and price the classification the packet names.
Certified payroll is part of performing the work, not a form you invent at the end. Someone on your crew has to be able to produce it in the agency’s format. If that person is you, the hours you spend on it belong in the bid. This is not a guide to filling out the forms. The solicitation and, where you need it, a surety or a labor advisor are. The point at bid time is that the cost is real and it is in this job only.
Bonds are a price, and a qualification
A bid bond says you will sign the contract if you win. A performance bond says you will finish. A payment bond says your suppliers and crew get paid if you do not pay them. Each has a cost, usually a rate on the contract price from a surety that has already decided you qualify. If you cannot get the bond the packet requires, you cannot bid the job, no matter how sharp the takeoff is. Find that out before you spend the estimating day.
Private commercial work sometimes asks for a bond too, especially for a general contractor. The same rule applies. Carry the premium in the number, or exclude it in a sentence the GC cannot miss.
Insurance exhibits are not “fully insured”
Public and private buyers both ask for certificates: general liability limits, workers’ compensation, auto, and often additional insured endorsements with specific wording. The owner-side checklist is what to verify before you award a commercial painting bid. On your side, match the exhibit before you propose. A certificate you cannot actually get is a bid you will be asked to withdraw.
Extra insureds, waiver of subrogation, and primary-and-noncontributory wording can change what your policy costs. Ask your agent on this packet, not on the last office repaint.
Do not mix it into the property-manager rate
A prevailing-wage school, a bonded tenant improvement, and a property-manager corridor repaint are three prices. Commercial painting versus residential painting as a business is the operating gap. Folding bond premium and a wage determination into your everyday square-foot rate makes every private bid high, and leaving them out of the public bid makes that bid false. Price the packet you were sent. Acknowledge every addendum. A blank on the bid form is a non-responsive bid, however good the scope letter is.