What to Verify Before You Award a Commercial Painting Bid
The bid you award is the bid whose scope matches the others, from a contractor who can legally be on the building and who has finished one like it. Price is the last check, after those are true.
The scopes match
Lay the estimates next to each other and read the surfaces, the prep, the products, the coats, the access, and the hours. A lower price that drops the door frames, the lift, or the night differential is a bid for a smaller job. Send it back for the missing lines before you call it the low bid.
What a commercial painting estimate should itemize is the checklist. If a line is missing on every bid, the scope you sent was missing it too. Fix the scope and reprice that line.
Insurance that matches the building
Ask for a current certificate of insurance, and read it.
- General liability, with limits your owner, manager, or general contractor already requires.
- Workers’ compensation if the contractor has employees. A one-person shop with no employees is a different situation, and the certificate should say so honestly. A crew on site with no coverage is the risk you are trying to avoid.
- Automobile coverage when they bring vehicles and lifts onto the property.
- Additional insured status, and a waiver of subrogation, when the lease or the prime contract demands them. The certificate should name the parties who asked.
“Fully insured” on a proposal is not the certificate. Match the dates to the schedule. A policy that expires in week two of a six-week repaint needs a renewal you have seen, or a requirement in the contract to keep coverage in force.
License, where the work requires one
Some states license painting contractors specifically. California’s C-33 classification is one example. Others license contractors generally above a dollar threshold, and others do not license painters at all. Look up the rule where the building stands, then look up the contractor. An active license in the wrong classification, or a license that belongs to a different company than the one on the contract, does not count.
Where no license applies, skip the badge and spend the time on insurance and completed work.
Similar work, and the person who will run it
Ask for two or three buildings of a similar type, size, and occupancy, finished recently enough that the coating has been through a season. Call the facility or property manager, not only the person who signed the purchase order. Ask whether the crew kept the hours they were given, how punch went, and whether change orders matched the unit prices.
Ask who the on-site lead will be, and whether that person is the one who walked your building. Commercial quality is a supervision question as much as a product question.
Bond, only when the project requires one
A bid bond or a performance bond is normal on many public awards and on some private jobs above a threshold set by the owner. It is an extra cost. Requiring a bond on a small private repaint that no bidder priced is a way to scramble the numbers at the end. If the solicitation or the lender requires it, say so in the scope so every bid includes it. If nothing requires it, you do not need it as a substitute for insurance and references.
The paper you sign
Award with a contract: scope, price, payment, schedule, change orders, and warranty. What belongs in a commercial painting contract covers those terms. How to hire a commercial painting contractor is the sequence that gets you to a short list worth verifying.
Describe the project and choose Commercial when you want one contractor to start that process with you.